Branch Configuration

The Parallel activity performs additional activities in parallel. It contains two separate branches (Sequence activities) by default, each of which represents a discrete route for entries.

To configure each branch

  1. Add the Parallel activity to your workflow definition by dragging it from the Toolbox Pane and dropping it in the Designer Pane.
  2. Drag and drop activities into each branch.